Phase I of the park was completed in 2017. Building I is a 626,000 SF building leased to Amazon. Building II, which was also completed in 2017, is a 400,758 SF single-loaded facility leased to Medline.
Phase II of the park was completed in 2019. Building III is a 544,429 SF building, of which 402,646 SF is leased to BMC. Building IV is a 154,266 SF single loaded facility. Building V is a 228,252 SF single loaded facility leased to Thermoflex.
Phase III of the park consists of 4 buildings totaling 918,972 SF. Buildings VI (188,944 SF), VII (128,914 SF), and VIII (100,314 SF) will be delivered in Q2 of 2020 and building IX (500,800 SF) will be delivered in Q4 of 2020.
Build to suit sites are still available for the 225 acre master planned business park.